Proelectrica – Mamonal

Projects |July 2, 2025

Strategically located in the industrial zone of Mamonal, Bolívar, the Proeléctrica Mamonal thermal power plant is a benchmark for reliability in the National Interconnected System (SIN). Since 1993, this natural gas plant has guaranteed reliable energy at the most critical times, especially during prolonged droughts.


With a capacity of 90 MW and improved cycle STIG technology, Proeléctrica Mamonal was a pioneer in Colombia as the first centrally dispatched plant under the reliability charge scheme. Its operation with two GE LM5000 turbines and a design focused on efficiency and low emissions position it as a robust and sustainable solution. The plant is currently undergoing a modernization and repowering process that will enable it to reach a capacity of 108 MW, improving its efficiency and reaffirming its commitment to the country's energy development.

Entrada en operación comercial de CSF

Fecha de inicio de operación: 7 de mayo de 2025. Proelectrica entro en operación comercial la

Uncategorized | September 1, 2025

Entrada en operación comercial de Nuestro Bogotá 

Fecha de inicio de operación: 21 de marzo de 2025. Desde Proelectrica, nos complace anunciar la

Uncategorized | September 1, 2025

Entrada en operación comercial de GD El Roble I

Fecha de inicio de operación: 25 de noviembre de 2024. En noviembre de 2024, Proeléctrica

Uncategorized | September 1, 2025