PCH Doña Teresa

Projects |July 2, 2025

Located in Segovia, Antioquia, the small Doña Teresa hydroelectric power plant efficiently harnesses the waters of the stream of the same name to generate clean and sustainable energy. With an installed capacity of 8.9 MW, this plant has been in operation since 2017, supplying energy for self-consumption through a Power Purchase Agreement (PPA) to the mining company Aris Mining.


Thanks to its continuous and reliable operation, it also injects surplus energy into the National Interconnected System, represented by Proeléctrica. Doña Teresa is a clear example of how renewable energies can be integrated with industry, generating shared value and reducing the environmental footprint.

Entrada en operación comercial de CSF

Fecha de inicio de operación: 7 de mayo de 2025. Proelectrica entro en operación comercial la

Uncategorized | September 1, 2025

Entrada en operación comercial de Nuestro Bogotá 

Fecha de inicio de operación: 21 de marzo de 2025. Desde Proelectrica, nos complace anunciar la

Uncategorized | September 1, 2025

Entrada en operación comercial de GD El Roble I

Fecha de inicio de operación: 25 de noviembre de 2024. En noviembre de 2024, Proeléctrica

Uncategorized | September 1, 2025